Material budget estimator

Concrete Slab Cost Calculator

Calculate a planning-level concrete material budget. Enter the supplier's price per cubic yard for a more relevant estimate.

No signupInstant resultUS + metric
Project dimensions

How it works

Calculate your material requirement

Estimate ready-mix concrete volume and material cost for a rectangular slab using a local price per cubic yard.

The formula

Estimated material cost = adjusted cubic yards × entered price per cubic yard.

Worked example

A 20 ft × 12 ft × 4 in slab needs 2.96 yd³ before waste. With 10% extra and concrete at $155/yd³, material is approximately $505.

Before you order

  • The result covers concrete material only.
  • Delivery, short-load, pump, reinforcement, forms, excavation, labor, permits, and finishing are separate.
  • Use a current quote from a supplier near the job site.

Common questions

Concrete Slab Cost Calculator FAQ

What costs are excluded?

Labor, reinforcement, base material, forms, finishing, delivery surcharges, pumping, demolition, and permits are not included.

Why does concrete price vary?

Mix design, region, fuel, delivery distance, order size, additives, and seasonal demand all affect pricing.

Can I use this as a contractor quote?

No. It is a planning estimate and should be checked against project drawings, site conditions, and current supplier pricing.